Q1 stock starts with a December decision.

For a repeat order, plan around December 15. For a new program, start the conversation by mid-November.

Wing insights / Chinese New Year 2027

Q1 stock starts with a December decision.

For a repeat order, plan around December 15. For a new program, start the conversation by mid-November.

A count-back from a January 20 production finish

Five production checkpoints illustrated with Wing assembly and factory photos
New programs / 2026Mid-Nov.

Start sample, artwork, and packaging discussions.

Repeat orders / 2026Dec. 15

Target PO and deposit confirmation, with production prerequisites ready.

Production target / 2027Jan. 20

Plan to finish the run before the holiday wind-down.

Chinese New Year falls on February 6, 2027. For appliance buyers planning first-quarter stock, the useful date to discuss is much earlier: when does the order need to be ready to enter production?

Our planning target is December 15 for repeat orders, and an initial conversation by mid-November for new programs. Those dates work backwards from a January 20 production finish, using Wing’s 35-day production run, including inspection.

The date depends on readiness. A confirmed PO and deposit need to be backed by available materials, completed approvals, and an allocated production slot. For this count-back, 35 days means calendar days; confirm the timing for your specific order.

01 / THE HOLIDAY WINDOW

Plan around the factory schedule.

The festival date is one milestone. The last production day, final goods collection, and return to full staffing are the dates your order needs.

For planning, allow for a late-January wind-down and a February restart period. Confirm the actual operating dates with your manufacturing and logistics partners rather than assuming that production runs until the holiday begins.

February 6 is listed as Lunar New Year’s Day in the Macao government’s 2027 calendar. This article does not assume an official mainland holiday window.

02 / WORK BACKWARDS

Put the milestones in order.

  1. Mid-November 2026 · Start a new programAllow 2–4 weeks for sample, artwork, and packaging approvals in this planning example. New tooling or additional development needs a separate schedule.
  2. December 15, 2026 · Confirm repeat ordersTarget PO and deposit confirmation, with materials and approvals ready for the allocated run.
  3. January 20, 2027 · Target production finishUse a 35-calendar-day run, including inspection. Separately confirm packing, release, and collection readiness.
  4. After release · Allow for transportFor the initial count-back, use roughly three weeks of ocean transit to the U.S. West Coast or five to the East Coast. Confirm the route and sailing with your forwarder, then add booking wait, customs, and inland delivery.

December 15 to January 20 is a 36-day interval. That leaves very little slack around a 35-day run. Outstanding components, late artwork, or a changed specification can move the plan.

And ocean transit starts with the sailing—not when assembly finishes. If your target is stock available at your warehouse, count back from that date through every handover.

Wing appliance assembly teams working on parallel production lines
Assembly at Wing. Production planning needs to account for checks during the run.
03 / INSPECTION INSIDE THE RUN

Quality checks belong in the production plan.

Wing’s 35-day run includes inspection. In-process checks help surface issues while the order is still on the line, so the team can address them before they become a separate queue of corrective work after assembly.

That answers one of the most useful questions behind a “confirmed production slot”: does the schedule include inspection? At Wing, it is part of the run.

When comparing quotations, ask what each lead time covers. Assembly-only timing and timing that includes inspection are different planning inputs. Final release requirements, packing, and any agreed third-party inspection still need to be explicit.

04 / PROTECT THE ARRIVAL DATE

A January PO can put Q1 stock at risk.

For this pre-holiday plan, December is the decision window. Waiting until January can push production or shipment beyond the intended window and move stock availability into Q2.

The quarter is not determined by the PO month alone. Product readiness, capacity, restart timing, transport, and the destination all affect when stock arrives. Confirm the complete count-back for your order before committing to a launch date.

Bring these details to the count-back.

  • Models and quantities.
  • Repeat order or new program.
  • Open sample, artwork, or packaging approvals.
  • Destination and intended shipping route.
  • Target ship date—and required warehouse arrival date.

Plan with Wing

Let’s work backwards from your deadline.

Send us your models, quantities, and target ship date. We’ll build the count-back with you—including what’s still open.

Build your production plan ↗